The Rekay intelligence system
Eight ways to make
the ground answer.
Choose the operating question. Each capability opens a live model, its evidence chain, matching datasets, licensing path and a direct route into delivery.
The intelligence ecosystem
Acquire. Design.
Build. Manage.
Select any desk to see what it needs before it can answer, and what it hands to the next one. Every line is a real evidence dependency, not a diagram.
Acquire
Prove the interest and read the land before capital is committed.
Design
Resolve what is buried and what the water does before the drawings are fixed.
Build
Measure the works against the design while correction is still cheap.
Manage
Hold the estate as a living, dated, valued record.
LandIntel™
Parcel evidence, competing-claim signals and continuous encroachment watch resolved into one lender-ready tenure picture.
TerraGhana™
Terrain, drainage, soil and climate signals combined into a defensible site-suitability and earthworks decision layer.
SkyGhana™
Repeat aerial capture, automatic change detection and tolerance-based alerts for mines, corridors, farms and cities.
BuildGhana™
Independent design-versus-as-built assurance, progress measurement and funder-ready evidence for infrastructure delivery.
AssetGhana™
Geolocated asset registers, condition intelligence and BIM-ready capture for public estates and distributed infrastructure.
Subsurface Ghana™
Utility mapping, ground-penetrating radar and excavation risk analysis for safer, faster delivery beneath congested ground.
DigitalGhana™
Inspectable digital twins that join photoreal context, measurements, asset records and time-based operational evidence.
HydroGhana™
Flood, shoreline and coastal resilience intelligence that turns exposure into investable adaptation evidence.
MineGhana™
Mine reconciliation, encroachment detection and regulatory compliance intelligence for Ghanaian gold, manganese, bauxite, lithium, quarry and sand operations — surveyed tonnage against declared, disturbance against the concession, and the evidence the Minerals Commission, the EPA and a lender each require.
InfraGhana™
Corridor and public-works programme assurance for Ghana: certified payment reconciled against independently measured physical progress, right-of-way and utility relocation blockers priced, working-season schedule forecasting, escalation and out-turn cost, and the disbursement evidence the Road Fund, GETFund, the Common Fund, the World Bank, AfDB, JICA and GIIF each require.
One continuum
Observe once.
Compound forever.
Every engagement improves the shared data core.
Every output remains queryable, traceable and reusable.
Every client moves from public proof to private operations.
